Power Grid: Brazil/Spain & Portugal (2009)
Speeltijd: 120
Min. Leeftijd: 12
Spelers: 2 - 6
Uitgever: Swan Panasia Co., Ltd., Edge Entertainment, 2F-Spiele, Giochi Uniti, Rio Grande Games, Galápagos Jogos
Ontwerpers: Friedemann Friese
Kunstenaars: Lars-Arne "Maura" Kalusky, Antonio Dessi
Mechanismen: Auction / Bidding, Network and Route Building, Market, Income
Min. Leeftijd: 12
Spelers: 2 - 6
Uitgever: Swan Panasia Co., Ltd., Edge Entertainment, 2F-Spiele, Giochi Uniti, Rio Grande Games, Galápagos Jogos
Ontwerpers: Friedemann Friese
Kunstenaars: Lars-Arne "Maura" Kalusky, Antonio Dessi
Mechanismen: Auction / Bidding, Network and Route Building, Market, Income
Beschrijving Tonen Opmerkingen Tonen Prijstrend
Two new expansion maps for Power Grid: Brazil on one side and Spain & Portugal on the other.
In Brazil, power providers prefer biogas for the production of electricity. Thus, players should consider the garbage power plants as biogas-fired power plants and the garbage resources as biogas tanks when playing with the Brazil maps. The fight for scarce resources is intense and will keep the players focused during the game!
In Spain & Portugal, the interests of power production develop in two completely opposite directions: Uranium will be much more important than in other games, however not at the beginning. The resource market will not get any new uranium at all during »Step 1«, but the supplies of uranium increase rapidly in »Step 2«. On the other hand, and at the same time, three large wind-power plants come onto the market. This clash of interests is intended!
The expansion includes a "Collector's Box" - a standard sized Power Grid box with space for the other expansion maps that have been released up to 2009.
In Brazil, power providers prefer biogas for the production of electricity. Thus, players should consider the garbage power plants as biogas-fired power plants and the garbage resources as biogas tanks when playing with the Brazil maps. The fight for scarce resources is intense and will keep the players focused during the game!
In Spain & Portugal, the interests of power production develop in two completely opposite directions: Uranium will be much more important than in other games, however not at the beginning. The resource market will not get any new uranium at all during »Step 1«, but the supplies of uranium increase rapidly in »Step 2«. On the other hand, and at the same time, three large wind-power plants come onto the market. This clash of interests is intended!
The expansion includes a "Collector's Box" - a standard sized Power Grid box with space for the other expansion maps that have been released up to 2009.
We hebben momenteel geen prijsgegevens voor dit spel.
Dit spel wordt momenteel niet verhandeld op de marktplaats:
Dit spel staat momenteel niet op de marktplaats. Als u het uwe wilt verkopen, voeg het dan toe aan de marktplaats.
Marktplaats
Het spel werd ook onder deze namen uitgebracht:
Alta Tensión: Expansión Brasil/Iberia ,
Alta Tensione: Brasile/Spagna e Portogallo ,
Extensie pentru Reteaua Energetica: Brazilia si Spania/Portugalia ,
Power Grid: Brasil/Espanha & Portugal ,
Funkenschlag: Erweiterung Brasilien/Spanien & Portugal ,
電力会社:拡張 ブラジル/スペイン&ポルトガル マップ ,
Power Grid: Brazil/Spain & Portugal ,
Wysokie Napięcie: Brazylia/Hiszpania i Portugalia ,
Alta Tensión: Expansión Brasil/España y Portugal ,
Power Grid: Brazil/Iberia ,
電力公司:巴西/西班牙&葡萄牙擴充
Gerelateerde Spellen
ag.gameitem.lastUpdated: 2025-05-02 22:26:25.629